Our motto
“We have to keep in our minds that nothing stays the same. Everything is in constant motion – we, our environment, our relationships, health, thoughts, our products and work, everything is changing. The things are getting better or worse. There is nothing in between. Stagnation means worsening. Every moment unused for improvement works against us.
We are working so to make things better.“
Ing. Lubomír Zelinger
Our story
-
2023
New photovoltaic power plant
In August 2023, a photovoltaic power plant with an output of 465.76 kWp was put into operation.
-
2024
Expansion of the production area
The company has made substantial investments in the expansion of its production site. The newly added material warehouse covers an area of 547 m². A new hall for the storage of finished products with an area of 920 m² has been seamlessly connected to the existing warehouses. One half of the original warehouses has been retained for storage purposes, while the other half has been converted into a production hall. As a result, the company has gained 651 m² of additional space for production expansion. The project also included the extension of the photovoltaic power plant to a total of 1,630 panels.


-
2025
The company has modern production facilities, including 51 injection moulding machines for efficient and high-quality plastics processing. To increase productivity and optimise warehouse operations, a fully automated Kardex storage system has been installed, ensuring fast material availability. The company’s development has also included the construction of new offices for the Quality Department.

-
Modern manufacturing premises
In our new premises we manufacture 3 million plastic mouldings every day, using modern working standards and maximum automation.


